Resource Type

Journal Article 305

Conference Videos 15

Year

2023 13

2022 14

2021 31

2020 15

2019 24

2018 10

2017 7

2016 15

2015 7

2014 24

2013 25

2012 16

2011 13

2010 26

2009 24

2008 11

2007 9

2006 4

2005 9

2003 5

open ︾

Keywords

steel fiber 5

fatigue 4

stainless steel 4

steel box girder 4

steel structure 4

Iron and steel industry 3

Baosteel 2

Sutong Bridge 2

Taizhou Bridge 2

cable-stayed bridge 2

durability 2

energy dissipation 2

fiber-reinforced polymer 2

finite element method 2

fire 2

high strength 2

high strength steel 2

microstructure 2

neural network 2

open ︾

Search scope:

排序: Display mode:

Construction Technology of Shanghai Jinmao Building

Ye Keming,Fan Qingguo

Strategic Study of CAE 2000, Volume 2, Issue 10,   Pages 42-49

Abstract: The main building consists of reinforced concrete core wall and exterior structure steel frame.

Keywords: Jinmao Building     extra-deep slurry wall     extra-high building     big-size steel tube pile     installation of steel    

Lifting installation and prestressed cable construction of suspendome roof for Wuhan Gymnasium

GUO Zhengxing, SHI Kairong, LUO Bin, TIAN Qiliang, WU Julong, BI Shuiyong

Frontiers of Structural and Civil Engineering 2008, Volume 2, Issue 1,   Pages 87-92 doi: 10.1007/s11709-008-0005-y

Abstract: The steel roof of Wuhan Gymnasium is a long-span suspendome structure system.According to the structural characteristics of the roof, the lifting installation of upper latticed shelland the installation and tension of lower prestressed cables are introduced in detail.

Keywords: practical     new-type     installation     consistent     Gymnasium    

Installation technology of counterweight system of Three Gorges Project ship lift

Cai Chunhua and Luo Bin

Strategic Study of CAE 2013, Volume 15, Issue 9,   Pages 70-76

Abstract:

The installation technology of counterweight system of Three Gorges ProjectThe overall installation procedure of counterweight system has been put forward which are suitable forThen the construction processes and construction methods of balance chain guide installation, balancingpulley installation, main hoist rope installation and counterweight installation have been describedAt the same time, the installation technology system of counterweight system is set up.

Keywords: Three Gorges Project ship lift     counterweight system     installation procedure     installation technology    

Research on the special lifting device for steel box girders of Sutong Bridge

Chen Ming,Wu Qihe,Luo Chengbin,Zhou Hanfa

Strategic Study of CAE 2009, Volume 11, Issue 3,   Pages 65-70

Abstract:

Sutong Bridge is a cable stayed bridge with a steel box girder and aThe steel box girder of main-span includes five portions: back span large unit, large block of pylon,

Keywords: Sutong Bridge     large units     lifting device     cantilever installation     lifting gantry     design and use    

Experimental and modeling studies on installation of arc sprayed Zn anodes for protection of reinforced

Xianming SHI

Frontiers of Structural and Civil Engineering 2016, Volume 10, Issue 1,   Pages 1-11 doi: 10.1007/s11709-016-0312-7

Abstract: Arc sprayed zinc (Zn) anode on concrete surfaces has been an emerging technology for protecting reinforced concrete structures from rebar corrosion in coastal environments. Many cathodic protection (CP) systems with arc sprayed Zn anodes will reach or exceed their design life in the near future and thus may function improperly or insufficiently, making it necessary to replace the aged anodes. However, prior to this study, little was known about the most effective profile for the concrete surface, for either new concrete or old concrete with existing Zn anodes removed. This work develops criteria to properly prepare the concrete surface before the application of new Zn anode. Experimental studies were conducted both in the laboratory and for a field structure in Oregon. Artificial neural network was used to achieve better understanding of the complex cause-and-effect relationships inherent in the Zn-mortar or Zn–concrete systems and was successful in finding meaningful, logical results from the bond strength data. The goal is to achieve strong initial bond strength of new Zn to concrete, which is essential for long-term performance of the CP system. The results from this case study suggest that it is necessary to adjust the anode removal and surface sandblasting based on the electrochemical age of the existing concrete. In all cases of sandblasting, minimize the exposure of large aggregates (e.g., those bigger than 19 mm in diameter).

Keywords: arc sprayed Zn     anode replacement     reinforced concrete     bridge preservation     neural networks     surface profile    

Energy and economic analysis of a point-focus concentrating photovoltaic system when its installation

C. RENNO, A. PERONE

Frontiers in Energy 2021, Volume 15, Issue 2,   Pages 384-395 doi: 10.1007/s11708-020-0717-9

Abstract: analyze energy and economic performances of a point-focus CPV system for a residential user when its installation

Keywords: CPV system     point-focus     experimental model     energy and economic analysis    

Drivability of Large Diameter Steel Cylinders during Hammer-Group Vibratory Installation for the Hong Article

W.J. Lu,B. Li,J.F. Hou,X.W. Xu,H.F. Zou,L.M. Zhang,

Engineering 2023, Volume 20, Issue 1,   Pages 180-191 doi: 10.1016/j.eng.2021.07.028

Abstract:

The Hong Kong–Zhuhai–Macao Bridge (HZMB) involved the installation of 120 mega-cylinderslarge-diameter cylinders under multiple vibratory hammers, predicting the penetration rate and time of steelIn this study, the vibratory penetration of large-diameter steel cylinders in the HZMB is investigatedThe vibratory penetration rate, installation accuracy, and dynamic responses of the steel cylinders at

Keywords: Hong Kong–Zhuhai–Macao Bridge     Vibratory pile driving     Wave equation analysis     Large-diameter steel cylinder    

Installation and demolition technology of Bailey truss of Three Gorges Project ship lift

Liu Yong,Chen Jianxia

Strategic Study of CAE 2013, Volume 15, Issue 9,   Pages 77-82

Abstract:

The installation and demolition of Bailey truss support system of Threeof the narrow construction site, high construction strength, and big construction disturbance, the installationThe installation and demolition technology system of bailey truss support system has been establishedThis technology system ensures the smooth implementation of the installation and demolition of bailey

Keywords: ship lift     Bailey truss     installation     demolition     Three Gorges Project    

The split installation and application of offshore wind turbine generator systems

Sun Guangxi,Huang Yaxin

Strategic Study of CAE 2010, Volume 12, Issue 11,   Pages 53-59

Abstract:

The installation methods used in offshore wind farm around the worldwere summarized, and the process of split installation, the set necessity and principles of assemblyAn installation method was proposed by sitting of the diving boat.The diving installation ship was made by installing a crane, and was located in the seabed during theThe installation method is suitable for offshore wind farm construction.

Keywords: offshore wind farm     method of assembled on shore     method of split installation     application    

Control measures of installation precision of Three Gorges Project ship lift rack and nut column

Wei Yan,Peng Hanlin,Lin Fan

Strategic Study of CAE 2013, Volume 15, Issue 9,   Pages 91-96

Abstract:

According to technology requirements of installation precision and characteristicsmethod and installation accuracy control elements have been in detailed analysis, put forward the suitablerack, nut column installation construction process and control measures for Three Gorges Project shipIn engineering practice, use the test of datum point to control installation precision of the rack andThus various high precision standard technical difficulties of installation of the rack, nut column,

Keywords: Three Gorges Project ship lift     rack     nut column     installation of control     precision control    

High precision installation technology of metal structure embedded parts of Three Gorges Project ship

Wei Shuman,Zhang Weiming and Li Chenzhi

Strategic Study of CAE 2013, Volume 15, Issue 9,   Pages 87-90

Abstract: parts, and combined with the site construction environment, this article analyzes the high precision installation

Keywords: ship lift     metal structure embedded parts     high precision     installation technology     Three Gorges Project    

Availability growth models and verification of power equipment

Jinyuan SHI, Jiamin XU

Frontiers in Energy 2021, Volume 15, Issue 2,   Pages 529-538 doi: 10.1007/s11708-019-0624-0

Abstract: The general availability growth models for large scale complicated repairable system such as electric generating units, power station auxiliaries, and transmission and distribution installations are presented. The calculation formulas for the maintenance coefficient, mathematical expressions for general availability growth models, ways for estimating, and fitting on checking the parameters of the model are introduced. Availability growth models for electric generating units, power station auxiliaries, and transmission and distribution installations are given together with verification examples for availability growth models of 320–1000 MW nuclear power units and 1000 MW thermal power units, 200–1000 MW power station auxiliaries, and 220–500 kV transmission and distribution installations. The verification results for operation availability data show that the maintenance coefficients for electric generating units, power station auxiliaries, transmission and distribution installations conform to the power function, and general availability growth models conform to rules of availability growth tendency of power equipment.

Keywords: system     power equipment     electric generating unit     power station auxiliary     transmission and distribution installation    

Steel Bridges in China

Pan Jiyan

Strategic Study of CAE 2007, Volume 9, Issue 7,   Pages 18-26

Abstract:

This paper contains a brief introduction of the development of the steelIt also introduces the characteristic requiremens of the material used in steel bridges.

Keywords: steel brigde in China     steel materials     design of steel brigde     structure of steel bridge    

On braced trapezoidal corrugated steel shear panels: An experimental and numerical study

Frontiers of Structural and Civil Engineering 2023, Volume 17, Issue 3,   Pages 396-410 doi: 10.1007/s11709-023-0934-5

Abstract: In this study, a new system consisting of a combination of braces and steel infill panels called thebraced corrugated steel shear panel (BCSSP) is presented.The results obtained from the parametric study indicate that the corrugated steel shear panel (CSSP)

Keywords: trapezoidal corrugated plate     steel shear panel     braced steel shear panel     experimental study     buckling    

Progress of Production Technology of Clean Steel at Baosteel

Cui Jian,Zheng Yiyu,Zhu Lixin

Strategic Study of CAE 2005, Volume 7, Issue 6,   Pages 21-26

Abstract: control technology of carbon, nitrogen, total oxygen, phosphorus, sulphur as well as inclusions in steelThe purity obtained in IF steel and pipeline steel is introduced.

Keywords: Baosteel     clean steel     IF steel     pipe line steel     steelmaking    

Title Author Date Type Operation

Construction Technology of Shanghai Jinmao Building

Ye Keming,Fan Qingguo

Journal Article

Lifting installation and prestressed cable construction of suspendome roof for Wuhan Gymnasium

GUO Zhengxing, SHI Kairong, LUO Bin, TIAN Qiliang, WU Julong, BI Shuiyong

Journal Article

Installation technology of counterweight system of Three Gorges Project ship lift

Cai Chunhua and Luo Bin

Journal Article

Research on the special lifting device for steel box girders of Sutong Bridge

Chen Ming,Wu Qihe,Luo Chengbin,Zhou Hanfa

Journal Article

Experimental and modeling studies on installation of arc sprayed Zn anodes for protection of reinforced

Xianming SHI

Journal Article

Energy and economic analysis of a point-focus concentrating photovoltaic system when its installation

C. RENNO, A. PERONE

Journal Article

Drivability of Large Diameter Steel Cylinders during Hammer-Group Vibratory Installation for the Hong

W.J. Lu,B. Li,J.F. Hou,X.W. Xu,H.F. Zou,L.M. Zhang,

Journal Article

Installation and demolition technology of Bailey truss of Three Gorges Project ship lift

Liu Yong,Chen Jianxia

Journal Article

The split installation and application of offshore wind turbine generator systems

Sun Guangxi,Huang Yaxin

Journal Article

Control measures of installation precision of Three Gorges Project ship lift rack and nut column

Wei Yan,Peng Hanlin,Lin Fan

Journal Article

High precision installation technology of metal structure embedded parts of Three Gorges Project ship

Wei Shuman,Zhang Weiming and Li Chenzhi

Journal Article

Availability growth models and verification of power equipment

Jinyuan SHI, Jiamin XU

Journal Article

Steel Bridges in China

Pan Jiyan

Journal Article

On braced trapezoidal corrugated steel shear panels: An experimental and numerical study

Journal Article

Progress of Production Technology of Clean Steel at Baosteel

Cui Jian,Zheng Yiyu,Zhu Lixin

Journal Article