Construction Technology of Shanghai Jinmao Building
Ye Keming,Fan Qingguo
Strategic Study of CAE 2000, Volume 2, Issue 10, Pages 42-49
Keywords: Jinmao Building extra-deep slurry wall extra-high building big-size steel tube pile installation of steel
Lifting installation and prestressed cable construction of suspendome roof for Wuhan Gymnasium
GUO Zhengxing, SHI Kairong, LUO Bin, TIAN Qiliang, WU Julong, BI Shuiyong
Frontiers of Structural and Civil Engineering 2008, Volume 2, Issue 1, Pages 87-92 doi: 10.1007/s11709-008-0005-y
Keywords: practical new-type installation consistent Gymnasium
Installation technology of counterweight system of Three Gorges Project ship lift
Cai Chunhua and Luo Bin
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 70-76
The installation technology of counterweight system of Three Gorges ProjectThe overall installation procedure of counterweight system has been put forward which are suitable forThen the construction processes and construction methods of balance chain guide installation, balancingpulley installation, main hoist rope installation and counterweight installation have been describedAt the same time, the installation technology system of counterweight system is set up.
Keywords: Three Gorges Project ship lift counterweight system installation procedure installation technology
Research on the special lifting device for steel box girders of Sutong Bridge
Chen Ming,Wu Qihe,Luo Chengbin,Zhou Hanfa
Strategic Study of CAE 2009, Volume 11, Issue 3, Pages 65-70
Sutong Bridge is a cable stayed bridge with a steel box girder and aThe steel box girder of main-span includes five portions: back span large unit, large block of pylon,
Keywords: Sutong Bridge large units lifting device cantilever installation lifting gantry design and use
Xianming SHI
Frontiers of Structural and Civil Engineering 2016, Volume 10, Issue 1, Pages 1-11 doi: 10.1007/s11709-016-0312-7
Keywords: arc sprayed Zn anode replacement reinforced concrete bridge preservation neural networks surface profile
C. RENNO, A. PERONE
Frontiers in Energy 2021, Volume 15, Issue 2, Pages 384-395 doi: 10.1007/s11708-020-0717-9
Keywords: CPV system point-focus experimental model energy and economic analysis
W.J. Lu,B. Li,J.F. Hou,X.W. Xu,H.F. Zou,L.M. Zhang,
Engineering 2023, Volume 20, Issue 1, Pages 180-191 doi: 10.1016/j.eng.2021.07.028
The Hong Kong–Zhuhai–Macao Bridge (HZMB) involved the installation of 120 mega-cylinderslarge-diameter cylinders under multiple vibratory hammers, predicting the penetration rate and time of steelIn this study, the vibratory penetration of large-diameter steel cylinders in the HZMB is investigatedThe vibratory penetration rate, installation accuracy, and dynamic responses of the steel cylinders at
Keywords: Hong Kong–Zhuhai–Macao Bridge Vibratory pile driving Wave equation analysis Large-diameter steel cylinder
Installation and demolition technology of Bailey truss of Three Gorges Project ship lift
Liu Yong,Chen Jianxia
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 77-82
The installation and demolition of Bailey truss support system of Threeof the narrow construction site, high construction strength, and big construction disturbance, the installationThe installation and demolition technology system of bailey truss support system has been establishedThis technology system ensures the smooth implementation of the installation and demolition of bailey
Keywords: ship lift Bailey truss installation demolition Three Gorges Project
The split installation and application of offshore wind turbine generator systems
Sun Guangxi,Huang Yaxin
Strategic Study of CAE 2010, Volume 12, Issue 11, Pages 53-59
The installation methods used in offshore wind farm around the worldwere summarized, and the process of split installation, the set necessity and principles of assemblyAn installation method was proposed by sitting of the diving boat.The diving installation ship was made by installing a crane, and was located in the seabed during theThe installation method is suitable for offshore wind farm construction.
Keywords: offshore wind farm method of assembled on shore method of split installation application
Control measures of installation precision of Three Gorges Project ship lift rack and nut column
Wei Yan,Peng Hanlin,Lin Fan
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 91-96
According to technology requirements of installation precision and characteristicsmethod and installation accuracy control elements have been in detailed analysis, put forward the suitablerack, nut column installation construction process and control measures for Three Gorges Project shipIn engineering practice, use the test of datum point to control installation precision of the rack andThus various high precision standard technical difficulties of installation of the rack, nut column,
Keywords: Three Gorges Project ship lift rack nut column installation of control precision control
Wei Shuman,Zhang Weiming and Li Chenzhi
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 87-90
Keywords: ship lift metal structure embedded parts high precision installation technology Three Gorges Project
Availability growth models and verification of power equipment
Jinyuan SHI, Jiamin XU
Frontiers in Energy 2021, Volume 15, Issue 2, Pages 529-538 doi: 10.1007/s11708-019-0624-0
Keywords: system power equipment electric generating unit power station auxiliary transmission and distribution installation
Pan Jiyan
Strategic Study of CAE 2007, Volume 9, Issue 7, Pages 18-26
This paper contains a brief introduction of the development of the steelIt also introduces the characteristic requiremens of the material used in steel bridges.
Keywords: steel brigde in China steel materials design of steel brigde structure of steel bridge
On braced trapezoidal corrugated steel shear panels: An experimental and numerical study
Frontiers of Structural and Civil Engineering 2023, Volume 17, Issue 3, Pages 396-410 doi: 10.1007/s11709-023-0934-5
Keywords: trapezoidal corrugated plate steel shear panel braced steel shear panel experimental study buckling
Progress of Production Technology of Clean Steel at Baosteel
Cui Jian,Zheng Yiyu,Zhu Lixin
Strategic Study of CAE 2005, Volume 7, Issue 6, Pages 21-26
Keywords: Baosteel clean steel IF steel pipe line steel steelmaking
Title Author Date Type Operation
Lifting installation and prestressed cable construction of suspendome roof for Wuhan Gymnasium
GUO Zhengxing, SHI Kairong, LUO Bin, TIAN Qiliang, WU Julong, BI Shuiyong
Journal Article
Installation technology of counterweight system of Three Gorges Project ship lift
Cai Chunhua and Luo Bin
Journal Article
Research on the special lifting device for steel box girders of Sutong Bridge
Chen Ming,Wu Qihe,Luo Chengbin,Zhou Hanfa
Journal Article
Experimental and modeling studies on installation of arc sprayed Zn anodes for protection of reinforced
Xianming SHI
Journal Article
Energy and economic analysis of a point-focus concentrating photovoltaic system when its installation
C. RENNO, A. PERONE
Journal Article
Drivability of Large Diameter Steel Cylinders during Hammer-Group Vibratory Installation for the Hong
W.J. Lu,B. Li,J.F. Hou,X.W. Xu,H.F. Zou,L.M. Zhang,
Journal Article
Installation and demolition technology of Bailey truss of Three Gorges Project ship lift
Liu Yong,Chen Jianxia
Journal Article
The split installation and application of offshore wind turbine generator systems
Sun Guangxi,Huang Yaxin
Journal Article
Control measures of installation precision of Three Gorges Project ship lift rack and nut column
Wei Yan,Peng Hanlin,Lin Fan
Journal Article
High precision installation technology of metal structure embedded parts of Three Gorges Project ship
Wei Shuman,Zhang Weiming and Li Chenzhi
Journal Article
Availability growth models and verification of power equipment
Jinyuan SHI, Jiamin XU
Journal Article
On braced trapezoidal corrugated steel shear panels: An experimental and numerical study
Journal Article